Completely refurbished
The existing polyurethane coating system was very cracked and lifting in large sections. This system was completely stripped off and the in-situ planks planed smooth. A fibre reinforced moisture tolerant primer was applied directly to the prepared timber and Cicol NT applied at a nominal thickness of 6mm with 1-3mm Dynagrip aggregate.
Hours of Work
Construction Date
Surface Area
After the greenhead timers were planed smooth and level on the carriage, Bituthene 4000 sheet water membrane was applied.
24mm thick Acme composite panels with a Ref 24 surface profile fixed with 314 stainless steel coach screws was chosen for the wearing course system.
Contact Us
Midland Industrial Flooring Ltd.
Head Office
Storm Barn, Thundery Hill, Seale, Farnham, Surrey, GU10 1LB
Manufacturing
Units 4-8 Bestwood Road, Pinxton,
Nottinghamshire, NG16 6NT
Contact
Tel: 01252 781314
Fax: 01252 782465
Email: info@mifl.co.uk
Latest Projects
- Car Park Ramp – StockportDecember 17, 2021 - 4:00 pm
- Black Bridge – ChippenhamNovember 26, 2021 - 3:00 pm
- RAF Brize Norton – OxfordshireMay 11, 2020 - 9:52 am