Restoring an Iconic Viewing Platform: Black Bridge, Chippenham

We were recently appointed by Wiltshire Council to replace the viewing platform deck at Black Bridge in Chippenham, a structure where we originally installed the decking back in 2001.
After 25 years, the Mark II MIF Acme Composite Panels had naturally reached the end of their lifespan. One panel had sustained damage, requiring the platform to be closed. MIFL were able to survey the structure, manufacture the new panels, and complete the full installation in less than one month!
The challenges involved:
Full fall arrest harness, rescue winch and rescue plan set up prior to removing and replacing the open span structural deck
Specialist access equipment required to negotiate the steep flight of stairs
Structural steelwork and galvanising inspected whilst clipped onto the structural beams, with Bituthene 4000 membrane applied to the horizontal bearing plate before installation
The binocular spindle hole left in the middle of the deck also required attention
Our AutoCAD design team adapted the original 2001 layout to meet the same structural load requirements, this time specifying MIF Mark IV Composite Panels which are 30% lighter than the Mark II panels they replaced.
Products used:
28mm thick, Ref 216 black MIF Composite Panels (viewing platform)
16mm thick MIF Composite Panels with white site line (stairs)
The result: a two-man team replaced the entire 24m² structural deck in just two days which minimised closure time, getting the platform back open to the public as quickly as possible.
Survey to completed installation in under one month.
Looking for a partner you can rely on? Call 01252 781314 or email info@mifl.co.uk to start the conversation.