Midland Industrial Flooring recently completed a 300sqm stores floor refurbishment at Rugby Rail Depot for Colas Rail, replacing a resin system originally installed in 1998.

The epoxy self-smoother laid by Midland Industrial Flooring in 1998 was starting to break up under the constant movement of fork trucks and pump trucks. The small wheeled trolly wheels were getting stuck in cracks and holes in the old resin floor screed.

Because the stores were in constant use 24/7, the store refurbishment works had to be phased within a two-week window. The old self-smoothing epoxy screed had debonded in many areas, so the entire system needed removing back to the in-situe concrete.

Proposed Solution
1. The entire floor was plantary grinded with a vacuum-captive, dust free, Floor planner to mechanically remove any existing defective self-smoothing system and also provide a tamped finish to the concrete floor.

2. MIF Grip ST, oil and surface tolerant primer pigmented was applied at 250g/sqm

3. Trowel applied Pumaflow light grey, 3 part heavy duty epoxy self-smoothing screed over the entire floor area to leave a uniform smoothed surface appearance ideal for trolleys and pump truck movements.

Products Used
MIF Grip ST Pigmented Primer.
Pumaflow medium duty epoxy floor topping with a smooth gloss finish.

Outcome
The entire installation was completed in two weeks and handed back to the client.

Client Feedback
The client immediate noticed how easily the small wheeled trollies glided over the smooth floor.

Looking for a partner you can rely on? Call 01252 781314 or email info@mifl.co.uk to start the conversation.

Recently, our team completed a cross hatching installation at Rugby Rail Depot for Colas Rail, helping to deter unsafe pedestrian behaviour under active roller shutter doors while working around tight operational constraints.

This project required careful planning, specialist materials, and precise execution to deliver a durable, high visibility solution in challenging conditions.

The solution we proposed..
1) To mechanically abrade the surface of the existing concrete with vacuum-captive, dust free shot
blasting to remove surface contaminants and laitance and provide acceptable key for overlayment.
2) The four doorways leading out from the stores and the welding shop, that have defective steel runners, will have additional preparation by removing steel tracks and the defective and broken concrete either side of the steel tracks, priming with MIF Grip FC Damp Primer and screeding with MIF Grip FC Floor Screed flush with surround.
3) To then mask up the rectangle and apply one coat of MIF Grip FC Damp Primer to the prepared concrete at a rate of 2.5m2/kg and whilst still wet to blind with 1-1.6mm Bassalt.
4) Mask up each of the doorways according to the matrix, and to roller apply one coat of MIF Grip FC Colourcoat in RAL1023 over the entire rectangle at a rate of 2.5m2/kg leaving a uniform-coloured surface.
5) Masking to then set up the 300mm yellow, plus 300mm black chevron pattern and apply one coat of MIF Grip FC Colourcoat in black into the black chevrons.

We managed to complete this in just two days working around heavy rain and howling gales.