
Another one of our recent projects, completed for Amco Giffen at Rudyard Valve Tower, Leek, Staffordshire.
The brief was to replace damaged and missing stair treads within an enclosed area near open water, ensuring a safe and durable solution.
Working across 64 steps (670mm x 300mm), the existing treads were carefully removed in sequence and used as a template to ensure accurate replacement.
New GRP treads including nosings in safety yellow were then marked, cut and installed. Each tread was drill fixed using 6mm x 60mm round head stainless steel screws, alongside Unibond PL300 adhesive and sealant for a secure finish.
The result is a robust, slip resistant solution that improves both safety and longevity in a challenging environment.
Completed over a 3 day installation period, the project was delivered efficiently with minimal disruption.
Client feedback was very positive, with the completed works meeting all of their expectations.
Looking for a partner you can rely on? Call 01252 781314 or email info@mifl.co.uk to start the conversation.


