21 Years On: MIFL Refurbishes Rugby Road Depot Resin Flooring

Who doesn’t love a before and after photo?!
Over 21 years after MIFL originally installed the flooring system to Rugby Road Depot (Pit 1), we returned to the site to carry out refurbishment works.
The project focused on maintaining safety, durability, and compliance within a live rail environment, where downtime had to be kept to an absolute minimum.
Our team carried out vacuum blasting, dust free surface preparation (to ensure a clean and stable substrate), followed by installation of a new high performance resin flooring system designed for heavy duty industrial use.
Key elements of the works included:
• Careful preparation of existing substrates to remove wear and contamination
• Application of compatible primers to ensure long term adhesion
• Use of high-strength resin repair materials designed to withstand heavy traffic and mechanical stress
• Finishing with durable coatings to restore performance and extend service life
All works were completed safely and efficiently, with minimal disruption to depot operations.
What makes this project particularly notable is the longevity of the original installation. More than two decades on, the flooring system continues to perform, a clear demonstration of the value of doing things properly from day one!
Projects like this reinforce MIFL’s commitment to safety, quality, and long term partnerships with our clients.