Not every challenge is technical, environmental considerations played their part in this one!

Not every challenge is technical, environmental considerations played their part in this one!

Midland Industrial Flooring was appointed by Gloucestershire Highways to carry out the refurbishment of Parkend Swing Bridge, located on the Gloucester & Sharpness Canal at Castle Lane, Gloucester.

The project involved the replacement of the existing MIF Composite Panels originally installed in 2010. While the works themselves were straightforward, the programme experienced unavoidable delays due to birds nesting on the structure.

Once works were able to commence, the priority was to complete the refurbishment as quickly as possible. The bridge provides access to local residents and businesses, and any extended closure would have required a long six mile diversion, making a fast redeck essential.

MIF Composite Panels were manufactured to measure as structural load bearing panels under ISO factory controlled conditions. The new panel layout was designed to match the existing deck configuration exactly, allowing the original panels to be swapped out efficiently with minimal disruption.

Using MIF 24mm Ref 4NT 3–5mm Composite Panels, the installation team completed the full deck replacement safely and efficiently. Despite the earlier delays, the entire installation phase was completed in just five days.

Local residents expressed their appreciation for our quick work and the minimal disruption.

This project marks the fourth bridge refurbishment of this type successfully delivered by Midland Industrial Flooring Ltd on the Gloucester & Sharpness Canal, reinforcing our experience in delivering durable, low disruption solutions for local authority infrastructure.