Over 21 years after MIFL originally installed the flooring system to Rugby Road Depot (Pit 1), we returned to the site to carry out refurbishment works.

The project focused on maintaining safety, durability, and compliance within a live rail environment, where downtime had to be kept to an absolute minimum.

Our team carried out vacuum blasting, dust free surface preparation (to ensure a clean and stable substrate), followed by installation of a new high performance resin flooring system designed for heavy duty industrial use.

Key elements of the works included:

• Careful preparation of existing substrates to remove wear and contamination
• Application of compatible primers to ensure long term adhesion
• Use of high-strength resin repair materials designed to withstand heavy traffic and mechanical stress
• Finishing with durable coatings to restore performance and extend service life

All works were completed safely and efficiently, with minimal disruption to depot operations.

What makes this project particularly notable is the longevity of the original installation. More than two decades on, the flooring system continues to perform, a clear demonstration of the value of doing things properly from day one!

Projects like this reinforce MIFL’s commitment to safety, quality, and long term partnerships with our clients.

Looking for an industrial flooring partner you can rely on for the long term?

Call 01252 781314 or email info@mifl.co.uk to start the conversation.

A full welding shop refurbishment completed in just 3 days, within a live 24/7 rail environment.

As part of ongoing improvement works at Colas Rail’s Rugby Rail Depot, Midland Industrial Flooring was appointed to refurbish the Welding Shop and adjoining Welding Corridor.

The project was driven by an internal audit requirement, with all walkways specified to be green with clearly defined yellow edges. In addition, the welding shop floor had suffered extensive impact damage, creating slip and trip hazards that needed to be addressed quickly and effectively.

All works were carried out within a live industrial environment operating 24/7, with welding activities continuing in close proximity throughout. As a result, all materials selected were solvent-free and low VOC, without compromising performance or durability.

Preparation works included:
• Mechanical abrasion and removal of defective coatings using a vacuum captive, dust-free shotblasting process
• Formation of a 10mm wide by 1mm deep saw cut along door thresholds to act as a resin anchor
• Filling all holes and local defects flush using MIF Grip ST Filler

Once preparation was complete, MIF Grip ST Pigmented Primer was applied at 2.5m²/kg, fully blinded with 0.4–0.8 DKI Quartz to achieve a uniform, slip-resistant surface at approximately 1mm thickness.

Finishing works included:
• Pumatect Fast Cure to the welding shop floor
• Pumatect Fast Cure to the welding corridor to clearly define walkways
• Pumatect V Fast Cure Safety Yellow applied to all specified edges for full safety compliance

Despite the operational constraints, the entire workshop and adjoining walkway (313sqm in total) were fully refurbished in just three days, with minimal disruption to depot activities.

Projects like this highlight the importance of careful material selection, detailed preparation, and efficient programme management when working in live industrial environments.

Looking for an industrial flooring partner you can rely on for safe, compliant, and long-lasting solutions?

Call 01252 781314 or email info@mifl.co.uk to start the conversation.

Not every challenge is technical, environmental considerations played their part in this one!

Midland Industrial Flooring was appointed by Gloucestershire Highways to carry out the refurbishment of Parkend Swing Bridge, located on the Gloucester & Sharpness Canal at Castle Lane, Gloucester.

The project involved the replacement of the existing MIF Composite Panels originally installed in 2010. While the works themselves were straightforward, the programme experienced unavoidable delays due to birds nesting on the structure.

Once works were able to commence, the priority was to complete the refurbishment as quickly as possible. The bridge provides access to local residents and businesses, and any extended closure would have required a long six mile diversion, making a fast redeck essential.

MIF Composite Panels were manufactured to measure as structural load bearing panels under ISO factory controlled conditions. The new panel layout was designed to match the existing deck configuration exactly, allowing the original panels to be swapped out efficiently with minimal disruption.

Using MIF 24mm Ref 4NT 3–5mm Composite Panels, the installation team completed the full deck replacement safely and efficiently. Despite the earlier delays, the entire installation phase was completed in just five days.

Local residents expressed their appreciation for our quick work and the minimal disruption.

This project marks the fourth bridge refurbishment of this type successfully delivered by Midland Industrial Flooring Ltd on the Gloucester & Sharpness Canal, reinforcing our experience in delivering durable, low disruption solutions for local authority infrastructure.

Looking for an industrial flooring and structural decking partner you can rely on in even the most challenging environments?

Wildlife included.


Looking for a partner you can rely on? Call 01252 781314 or email info@mifl.co.uk to start the conversation.

At Midland Industrial Flooring Ltd, we specialise in designing and manufacturing long lasting, safety led composite panel systems that perform in demanding public environments.

Our recent project for Swansea Council at Olchfa School Footbridge in Sketty, Swansea, demonstrates our ability to deliver bespoke refurbishment solutions that enhance safety and durability while minimising disruption.

Originally installed in 2003, the MK3 Acme Composite Panels on the 44-metre-long footbridge had worn along the centre of the deck span. Water pooling had become a recurring issue, particularly in winter when freezing created a safety hazard.

MIFL manufactured and installed new MK4 Composite Panels with a built-in fall and enhanced waterproofing system.

The solution included:

  • Manufacturing MK4 MIF Composite Panels with a built-in fall in one section to eliminate pooling.
  • Incorporating a machined joint detail and polyurethane joint sealant for a fully waterproof system.
  • Using flexible resins in the manufacturing process to accommodate microcrack stresses caused by repeated footfall.
  • Specifying a Reference 216 slip-resistant pedestrian profile with additional wear resistance.
  • Installing a MIF Alispar tread, screwed and glued to the original landing tread to maintain level transitions and prevent trip hazards.
  • The installation was completed within five days during the October half term holiday. The refurbished footbridge is now fully waterproof, puddle-free, and performing to client expectations.
  • Swansea Council commended the quality of workmanship.

This project showcases MIFL’s unique capability as a UK based manufacturer and installer to design and deliver bespoke solutions for challenging site conditions.

Looking for a reliable partner for your next infrastructure or public works project?

📞 Call 01252 781314 or email info@mifl.co.uk to start the conversation.